This project consisted of removing the asbestos throughout the entire building. Once Asbestos Fiber Analysis testing was completed and passed, we resumed with the renovation portion of the project which consisted of replacing all ductwork and mechanical equipment, electrical wiring and fixtures, plumbing piping, as well as replacing finishes consisting of drywall, paint, and flooring.